Hertz Fleetlease

Client:
Redwood Group Limited

Location:
Mt Wellington, Auckland

Year Started:
2001

Duration:
7 Months

Project Value:
$4.9M

Contract Type:
Novated Design & Build

Canam Construction was the Design and Build contractor of the $4.9m Hertz Fleetlease Building. The building is located within the Apex Business Centre, Mt Wellington and has high exposure due to its position adjacent to the southern motorway.

The three-storey building included a basement level for vehicle parking and servicing, ground floor offices with vehicle display and parking, and a top floor area for office and administration. An expansive double height space with feature steel trusses is located facing the southern motorway for vehicle display.

Construction of the building was fast tracked and includes a mixture of precast concrete, in-situ concrete and structural steel framework. Floors are precast rib and timber infills with in-situ structural topping slab. The external façade is a mixture of precast panels, aluminium joinery, louvers, composite panels and zincalume cladding.